2025-04-07 Competition Architecture Sync
Attendance
@Evan Janakievski
@Alison Thompson
@Andrew Chai
@Daniel Puratich
@Nathan Green
@Balaji Leninrajan
@Kenny Na
@Manasva Katyal
@Meghan Dang
@Nathan Green
@Roni Kant
@Victoria Gee
@Georgia Westerlund
@Maxwell Lou
@Herman Gahra
@Derek Tang
Flight Test Updates
Proof of flight for X500 and Peggy 2 completed
Eclipse maiden out of scope
Francis didn’t fly this weekend
issues setting up hotspot in the field
Task 1
PLANNING: Peggy 1 Readiness
To order if blue controller still works (should be tested before meeting):
Nomad Dual 1-watt Gemini Xrossband ExpressLRS Module – RadioMaster RC
@Evan Janakievski to order this evening
Manasva and I to switch it over to gemini from lte
STATUS: Autonomy Updates:
Documentation links to be added here @Maxwell Lou
https://uwarg-docs.atlassian.net/wiki/x/iIB_p - Airside script (run on the rpi)
https://uwarg-docs.atlassian.net/wiki/x/VQAsqw - Ground side script (run on the laptop/ground station)
STATUS: MAVLink KML messages
@Tochi Okoro @Maxwell Lou
Attempt at ground test
Fixed a bug from previous commit
Not completely tested
STATUS: Geolocation of Beacons
10 m altitude to meet 3 m accuracy
STATUS: Pathing
Any updates @Balaji Leninrajan
made significant progress on multi-drone pathing
STATUS: Peggy 2 Tuning
Flew very stable still with extra pumps, does not seem to need adjustment to tune
STATUS: New Pi Interface PCBAs
Not needed (we have the two Rev Bs required)?
Correct, i forgot to remove bullet
Are we still working on Rev C assembly?
validated for power and just missing one IC (killswitch)
STATUS: Fuse coords from drones by sending to one central computer
cc @Balaji Leninrajan
Discussed during pathing meetings
Unsure about doing this
Last thing to do between terms if there is time
Other more pressing things
Merging KML files is being worked on, but not sending between ground stations
What Drones are we flying for task 1:
Drones:
Dallas/Houston → RPI 5 + interface → 10 mins flight time → not very stable airframe currently
X500 → RPI 5 + interface → 10 mins flight time
Cali Drone (Francis) → RPI Zero → 45 mins flight time
Justification discussed last meeting.
Flight line decision? Do we want to wait for this?
Nathan
Daniel
Evan
Manasva
fifth person must be mech or auto
auto good for task 1 kml stuff
backup GSO would be nice
mech good for batt swaps n fixing thing
mech would be more applicable for both tasks
Likely Alison, will discuss further in next comp sync (April 14th)
Task 2
STATUS: Task 2 Payload
Finishing mounting to Peggy 1 and 2
What drones are we flying for task 2:
Drones: Pegasus 1 & Pegasus 2
Justification: see last comp sync
Peggy 1 Weight inquiry
are we overweight?
is it similar to peggy 2?
@Evan Janakievski to check (hopefully before meeting)
EE to do harnessing on drones
Peggy 1 to switch VTX to 5.8 GHz
Switching VTX channels to match this
Other
STATUS: EFS CAN Lighting Board
@Nick Armstrong @Manasva Katyal @Derek Tang
Flew successfully last flight test! Mounted on x500
Were able to port to secondary CAN driver so it can run seamlessly in current configuration.
REV4 port should be done by next FT@Nick Armstrong !!!
Only one flight mode not validated: RTL
Less bright than ideal, can be increased as those developing them didn’t want to get blinded
STATUS: Batteries Order
Arrived in medicine hat, @Emma Chan @Victoria Gee did we get an email confirming this from joleine? Or could we send one to confirm?
yes, got an email saying “received”
Send confirmation email about receiving proper order and how to get them once we are there
Confirm 4 6s and 3 3s potentially
STATUS: Cali Airframe
Francis
didn’t fly last weekend
nathan is working on software for it this week
will fly next weekend, still need to evaluate changes to tuning
12th or 13th at the latest
Alison can help during the week
hoping to test new megabattery then as well
by weekend can test more software for the KML
STATUS: x500 Holybro airframe
Loo
Louie
Other names:
PLANNING: Mission planner/Lua scripts for Task 1 and Task 2
@Evan Janakievski @Manasva Katyal bit overloaded at the moment
Still aiming to try to get this ready
STATUS: Dallas
Got params matching Houston
Not flyable at the moment as one motor is out of commission
One of those motors is on a foam plane, will take from there
Turns out this is not the same motor, looks the same but has a different kV value
we need spare props at the least
AEAC 2025 Team Packing List and should add a budget as well
PLANNING: Transporting the drone
Need to order containers or measure suitcases
Someone to check dimensions of Peggy and dimensions of suitcases Manasva, Tochi, and Alison offered
@Alison Thompson to do
STATUS: Proof of flight videos for all drones
Needs to be edited
francis is ready → needs to be uploaded
x500 and peggy 2 ready
caption and splice them together
to be done next week
raw, unlisted video on youtube, will be rlly long
@Georgia Westerlund will do the editing (next week bc
STATUS: Registrations
@Manasva Katyal registrations for six drones
Spare parts list
@Evan Janakievski @Manasva Katyal
Need to go through bay this week
cc @Alison Thompson for ref
need to happen this week because shipping stuff to bay will take time
@Daniel Puratich
Has anyone done RPAS safety declaration? No.
Can I bulk do them for everything this evening if not? seems like a yes
Will ask @Nathan Green for details this evening and then
all registration numbers are in confluence
Flight Test Planning
Thurs April 10th
Manasva tuning Dallas
Friday, April 11th
Aim is to get proof of flight Peggy 1 & Dallas
Peggy 1 tuning
Extra time dedicated to autonomy
Timeline
We have five weeks left until competition.
Avoid changes and high risk operations in the couple of days leading up to competition as we need time to make fixes
How far are we away from having proof of flight for the onsite airframes?
X500
not in comp configuration yet (mount rpi but rpi software doesnt need to work)
have the mount ready just need to test fit and mount
PoF is done
Houston/Dallas
needs motor replaced
April 11th for PoF
Peggy 1 w/ Payload
April 12th for PoF
payload is now on it
needs switching to 5.8 GHz
tuning and adjustment from Peggy 2 tune
Peggy 2 w/ Payload
need to test four pumps working
PoF done
Lebron
PoF recorded
on @Daniel Puratich's phone, will upload ← this still needs to be done
Flight test dates and stuff entered into Asana
Tuesday, May 6th everything gets packed up and drones taken apart.
Binding phrases need to be updated to various ones for all drones that would fly simultaneously
Suggest Peggy 2 to stay as wargify so BetaFPV can stay as wargify and be used on others drones too
Binding Phrases
every drone needs it’s own binding phrase as we intend on flying simultaneously
see thread here for discussion
@Evan Janakievski to come up with what each of them should be