2024-04-14 Competition Arch Sync

2024-04-14 Competition Arch Sync

Attendance

  • @Daniel Puratich

  • @Nathan Green

  • @Georgia Westerlund

  • @Manasva Katyal

  • @Ryan Scomazzon

  • @Derek Tang

  • @Tochi Okoro

  • @Victoria Gee

  • @Nick Armstrong

  • @Evan Janakievski

  • @Alison Thompson

  • @Andrew Chai

  • @Balaji Leninrajan

  • @Maxwell Lou

  • @Meghan Dang

  • @Roni Kant

Previous Week’s Flight Tests

  • Francis

    • adjusted settings and tune is good on light pack

    • another test we didn’t fly as megapack interfere’s with GPS

  • X500

    • No updates, was not flown

  • Dallas/Houston

    • RTF’d and tuned; now in a flyable state

    • EKF high vibe

  • Peggy 1

    • RTF’d and tuned; now in a flyable state

  • Peggy 2

    • No updates, was not flown

Task 1 Approach

  • Peggy 1 Readiness

    • Only item left is VTX cam

    • Thoughts on just stealing Eclipse’s for now and mounting it directly?

      • No need for mux, for Task 2 we just need downwards cam.

    • Camera systems for drones

      • Peggy 2

        • 1.3 ghz

        • Downward facing cam

      • Peggy 1

        • 5.8 ghz

        • Downward facing cam

      • Neptune

        • 5.8/1.3

        • Mux for pi desktop and downward facing cam

      • Dallas

        • 5.8/1.3

        • Mux for pi desktop and downward facing cam

  • Autonomy Updates

    • Just waiting on confirmation from a flight test

  • Drones:

    • Dallas/Houston

    • X500

    • Cali Drone (Francis)

  • Testing and competition simulation readiness

Task 2 Approach

  • Task 2 Payload

    • Ready for Peggy 1 and Peggy 2

  • Wiring Status

    • Pumps are wired

    • Float sensor wired, but not configured in parameters

  • Testing Status

    • Ground tested for pumps to turn on

    • Not flight tested

  • Tubing

    • will test difference of pumping speed with 2 vs 4 pumps and changes in length

General

  • LED System Status

    • Code is done (@Nick Armstrong )

    • Validated in flight by @Manasva Katyal

    • We have a set of four that is in flyable state (2x rev3 & 2x rev4)

      • More are assembled and to be validated soon

      • Needs some ee cleanup, Ryan will stay a day and do after finals (April 22/23/24)

        • 3x rev4

    • Could just fly two per drone worst case

  • Batteries shipping status

    • Wil send email for them to open box and confirm contents

  • drone packing situation

    • @Alison Thompson to test in cad for placement of peggy parts in suitcases

    • Look into foam for filling voids

  • packing list updates

    • @Evan Janakievski @Alison Thompson to look for mech items

    • Battery chargers → both and bring power supply for newest one

    • 1.3 ghz receiver

    • VTX box and controller box + nomad module (doesnt fit in controller box)

    • Mech needs to order spares of fasteners and possibly oring

    • Antennas for EP Duals (just bring new EP duals)

  • tuning readiness

    • everything is now tuned (excluding yaw axis for Dallas)

    • Some finer tuning occurred for Peggy 2 and Neptune but not for Dallas and Peggy 1

  • registrations

    • done

  • VTX table

    • Need to set up drones in Waterloo to match this

  • binding phrases

    • Task #1:

      • Peggy 1: wargify1

      • Peggy 2: wargify2

    • Task #2:

      • Neptune: wargify1

      • Dallas: wargify2

      • Francis: wargify3

  • Spare Parts Order

    • thread in #integration

    • Motors for Peggy

    • Props for Peggy

    • Props for Dallas (2x pair)

    • Props for Neptune (2x pair)

    • ESCs

  • 3D print spare parts

    • @Alison Thompson @Evan Janakievski @Camilo Artigas Alos make list

    • Landing gear for Peggy 1 and 2

  • Logistics Updates

    • Car Drivers:

      • Nathan

      • Georgia

      • Alison

      • Daniel

    •  

Upcoming Flight Tests

  • Thursday

    • Test Task 2 payload with 4 pumps and one small drone for Task 1

    • 4ish @Ryan Scomazzon and @Evan Janakievski will head out for this