2023-09-28 EE Meeting
General Team Status/Schedule:
Meeting times:
EE Meeting: Thursdays 9 PM EST E5 1006
Leads Meeting: Wednesday 9 PM EST E5 1006
Team Competition Aircraft Sync: Tuesday 9 PM
Attendance:
Online |
---|
Updates this week!
Admin
Remember to fill in the team roster if you have not done so! This is required every term: https://tinyurl.com/WARGTeamRoster
If you are a new member/bootcamper please make sure you have read through: New Member Onboarding - Administration - WARG (atlassian.net) and completed the required LEARN courses. If you need help with this message any of the leads!
If you are onsite this term please assign your self the EE on-site role in discord #role-signup
Asana/Confluence
Tesla event just happened. Great turnout! If you are onsite be sure to be on the lookout for events like this !!!
Active PCB Projects
High Current Power Module (Zen, Taim, Steven)
Zen handed off to Taim and Steven
Figuring out next steps (4 layer vs 2 layer, component layout, etc)
12S ESC (Ethan, Chris)
No progress this week
Goal for next meeting is to generate FOC firmware will all board parameters inputted into Workbench
6S ESC (Mena, Rayyan)
Continuing component selection
Component selection deadline for this weekend but will probably be updated
LED Controller (Neel, Parker)
Sync maybe on Sunday (maybe work session)
Planning on having directors + ee-lead sync to discuss conops stuff for better knowledge of use case (sunday?)
ELRS Gemini (Michael, Farris)
FM: PCBs ordered from JLC and in production!
Drone Battery PCB (Farris)
FM: Didn’t get a chance to work on this, swamped w/ schoolwork
Aiming to work on schematic over weekend, nail out mechanical form factor over next week
PDB (Tom)
Chose PMOS for RPP, was down with a sore throat fever for 4 days, but will get back on component selection for peripherals.
Tracking Antenna (Nolan, Hardy)
Component selection complete
Part input
12S Servo Module (Stanley, Jack, Jerry)
Stanley: Nothing to add, will try to contribute more to the project in the coming week
Jerry: I reduced the board size to 30x30, aiming to get placement reviewed again this weekend
routing by next EE meeting ideally (+ review)
Drone Wiring
Pegasus Spin Up and Work session this Saturday!