2022-05-30 EE Leads ReOrg
Sahil: What s the problem
Kevin mentioned there is a disconnect between what happens as a lead to what happens outside of the BootCamp. As well, it is hard for boot campers to follow.
Daniel mentions he sees a problem where the EE team is not engaging or utilizing their members to their potential. Since the start of the term, the team has had nothing assigned to them form the leads, the entire team is idiling at the moment. It feels unusual and wrong
Kevin mentions there are tasks that need to be complete first:
Power Architecture?
Daniel mentions having a sooner meeting rather than sitting and waiting for a whole week
Need to assign a work sessions, team sessions more focused on mentorship
ZP3?
Daniel mentions that there should be separation
More onsite stuff
More separation between bootcamp
Doing anything will be good
Work sessions should be a thing
Are either feeling overworked?
Kevin mentions occasionally burnt out
Daniel mentioned he doesn’t get time for bootcamp
Kevin reemphasizes that the EE team is doing
How often you’ll checkup on the team
Stuff is happening in DM’s
Give visibility to conversations
Transparancy/Checking up on people
“uses verbiage students”
When is this meeting type questions?
Key Symptoms
No one except leads are talking about EE stuff
Kevin believes that there is a very big knowledge gap and it isn’t stimulating interaction
Engaging people more in meetings and stuff
Listening in on meetings and seems more lively there
People have to be doing things
A lot of our discussion is on team operation
Daniel feels he is not providing enough opportunity
Sahil’s observations
Team is idling
Brainstorming solutions
Evaluation boards?
Bootcampers and emphasis on them?
Learning
Team is idling
Researching things in ideas phase
Evaluation Boards